Next Ariane 5 Mission Enters Payload Integration Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 05, 2014

Next Ariane 5 Mission Enters Payload Integration Phase

Heavy-Lift Mission Scheduled For Launch Next Week

Payload integration is underway for Arianespace’s upcoming heavy-lift Ariane 5 mission, which is scheduled for next week from French Guiana with two commercial telecommunications satellites: MEASAT-3b and Optus 10.

Recent activity at the Spaceport included initial steps in creating the dual-payload “stack,” with MEASAT-3b riding in the upper position.  This involved installing the relay platform – manufactured by Airbus Defence and Space – atop Ariane 5’s SYLDA dispenser system in the launcher’s Final Assembly Building.  

MEASAT-3b was then encapsulated by Ariane 5’s ogive-shaped payload fairing, completing the payload stack’s upper portion and readying it for positioning over Optus 10 after this spacecraft is installed atop the launcher.

During the Ariane 5 mission, which is set for the evening of September 11, MEASAT-3b will be released first into geostationary transfer orbit, followed by separation of the SYLDA dispenser – enabling Optus 10’s subsequent deployment.

MEASAT-3b is equipped with 48 high-power Ku-band transponders to expand direct-to-home broadcasting and VSAT (very small aperture terminal) services across Malaysia, India, Indonesia and Australia.

Optus 10, which was built by SSL (Space Systems/Loral) for Australian telecommunications service provider Optus, has been fueled at the Spaceport in the S5 payload preparation facility.  This satellite is outfitted with 24 Ku-band transponders to provide direct TV broadcast, internet connectivity, telephone and data transmission services for Australia and New Zealand.

The Ariane 5 mission with MEASAT-3b and Optus 10 is designated Flight VA218 in Arianespace’s launcher family numbering system. It will be the fourth launch of the heavy-lift workhorse from French Guiana in 2014.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC