EADS Adds Three Years To A400M Timetable | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Jan 12, 2009

EADS Adds Three Years To A400M Timetable

'New Approach' Means More Of Same Delays

Airbus Military and EADS announced Monday a "new approach" for the oft-delayed A400M military program... telling its partner nations they must join together to "find a way forward" with the trouble-plagued aircraft.

In a release issued Monday, both entities stated they "want to discuss the program schedule along with changes to other areas of the contract including in particular certain technical characteristics of this first-class military aircraft."

What that rhetoric boils down to, reports Bloomberg, is a three-year delay in first deliveries for the airlifter intended to compete with the C-130 Hercules.

As ANN reported, planning for the A400M began in the mid-1980s, but several technical issues and a fair amount of political backbiting prevented the placement of first orders until 2003. To date, nine countries have signed on for a combined 192 aircraft... but they've faced a number of technical delays and even more excuses from Airbus since then.

Airbus owner EADS announced in September the A400M's first flight had been delayed until sometime in 2009, and attributed the delay to trouble with the engine program. Safran pointedly responded at the time that Airbus already had eight TP400s in their possession, enough to power the first two planes.

Since then, the first TP400 has flown on a C-130 testbed, and the A400M test plane is still on track to fly sometime this year... but the first production planes will not be delivered until sometime in 2012, at the very earliest.

Airbus Military stated "adequate maturity" must be reached, "based on flight test results," before the company will commit further to a delivery timetable.

"Airbus Military and EADS will only be able to reliably determine all financial implications once a committed industrial plan, including the availability of systems, is fully stabilized and once OCCAR's position on the proposal is known."

Nick Cunningham, an analyst with Evolution Securities, said the latest delay could result in as much as $6 billion in new losses for EADS. He changed his recommendation on EADS stock to "sell" on the news.

FMI: www.airbusmilitary.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC