New CSeries Aircraft Wing Factory Taking Shape In Belfast | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Mon, May 23, 2011

New CSeries Aircraft Wing Factory Taking Shape In Belfast

Installation Of Assembly Jigs Latest Milestone To Be Reached

Bombardier has begun installing semi-automated jigs at its new wing facility in Belfast, Northern Ireland, to support assembly of the advanced composite wings for the all-new CSeries aircraft. The jigs, fixed machinery that will be used to assemble the primary structural components of the composite wing torque box, are being installed in the second phase of a new, state-of-the-art 600,000 sq. ft. manufacturing and assembly facility. The first phase of the new factory, which will accommodate the fabrication of the composite components, was completed on schedule towards the end of 2010.

Bombardier's Belfast operation is responsible for the design, manufacture and integration of the advanced composite wings for the CS100 and CS300 jets, including all flight control surfaces and high-lift systems. The primary structural components of the wings will be produced using the unique Resin Transfer Infusion (RTI) process that has been developed by Bombardier Aerospace, Belfast engineers.

"The installation of the wing assembly jigs is another milestone that brings us a step closer to producing wings for the CSeries aircraft program," said Michael Ryan, Vice President and General Manager, Bombardier Aerospace, Belfast. "The jigs are highly automated and will allow us to control the assembly of the wings with a high degree of precision. We already installed a specially designed assembly jig to produce a pre-production wing technology demonstrator, and are now applying what we have learned from this to the actual production assembly jigs. We are confident that, working with our suppliers, we have implemented a tooling process that meets our high production standards," he said.

Last summer, Bombardier successfully completed the ultimate load test on the CSeries aircraft composite pre-production wing, replicating 150 per cent of the most severe forces the wing is ever likely to experience in service. The pre-production wing is part of the overall complex research and development program that Bombardier has undertaken to 'prove out' the new technology, manufacturing and assembly processes it is applying to the composite wing.

Meanwhile, all production equipment has been installed in the fabrication section of the new wing facility, which comprises a production area and low contamination 'clean room' area. Equipment installed includes a fabric cutter, a multiple-axis machine cell, pre-formers, an autoclave and non-destructive testing equipment. Production of the CSeries aircraft advanced composite wings is due to begin later this year.

FMI: www.bombardier.com

 


Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC