Factory Leasing Program Announced For Great Lakes By WACO | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Dec 03, 2014

Factory Leasing Program Announced For Great Lakes By WACO

Designed To Support Upset Prevention And Recovery Training Flight Schools

WACO Aircraft Corp. has rolled out a new Factory Direct leasing program for the Great Lakes 2T-1A-2. The company says the program is designed to support the Upset Prevention and Recovery Training needs for Flight Schools and help them comply with FAA AC 120-UPRT, FAA AC 120-109 and upcoming ICAO 10011 “Airplane Upset Prevention and Recovery Training” manual guidelines.

This simple lease plan is comprised of a low monthly base lease rate that includes flight hours, then an hourly rate for time over the included base. The program includes all scheduled maintenance. The program can be custom tailored for the unique needs of each school and features a streamlined approval process.
 
The new Great Lakes by WACO is a fully aerobatic, 180 horsepower aircraft featuring docile ground handling yet excellent aerobatic capability. The company says those characteristics make it "the perfect trainer for Loss of Control In-Flight (LOC-I) programs."
 
Integrating Upset Prevention and Recovery Training into your flight curriculum is an upcoming requirement for all part 141 schools.
 
The lease includes:

  • All Scheduled Maintenance including parts
  • Oil Changes (every 50 hours)
  • 100 Hour Inspections
  • Annual Inspections
  • Pitot and Static certification
  • Squawks affecting the airworthiness of the airplane
  • Engine Replacement at TBO (1600 hours)
  • Complete aircraft overhaul at the factory every 3200 hours

The airplane has been certified by both FAA and EASA for transition training for instructors needing minimal checkout time.

(Image provided by WACO Aircraft)

FMI: www.wacoaircraft.com

 


Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC