Boeing Fatigue Test To Validate Predicted Life Of B-1 Bomber Fleet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Tue, Sep 04, 2012

Boeing Fatigue Test To Validate Predicted Life Of B-1 Bomber Fleet

USAF Hopes To Fly The Aircraft Until At Least 2050

A five-year testing program is underway on the  wing of a U.S. Air Force B-1 bomber to validate the predicted life of the bomber fleet, currently expected to be 2050. The testing is being carried out by Boeing. The test also will reveal potential areas of concern for which Boeing and the Air Force can develop maintenance and repair plans.

"This comprehensive testing is a proactive way for Boeing to meet its mission of keeping the B-1 bomber fleet ready and viable," said Rick Greenwell, Boeing B-1 program director.
 
Boeing and the Air Force also plan to fatigue-test a B-1 fuselage at Boeing Tukwila beginning in November 2013.
 
The B-1A was initially developed in the 1970s as a replacement for the B-52. Four prototypes of this long-range, high speed (Mach 2.2) strategic bomber were developed and tested in the mid-1970s, but the program was canceled in 1977 before going into production. Flight testing continued through 1981.
 
The B-1B is an improved variant initiated by the Reagan administration in 1981. Major changes included the addition of additional structure to increase payload by 74,000 pounds, an improved radar and reduction of the radar cross section by an order of magnitude. The inlet was extensively modified as part of this RCS reduction, necessitating a reduction in maximum speed to Mach 1.2.

The first production B-1 flew in October 1984, and the first B-1B was delivered to Dyess Air Force Base, Texas, in June 1985. Initial operational capability was achieved on Oct. 1, 1986. The final B-1B was delivered May 2, 1988. The U.S. Air Force says B-1 is the backbone of America's long-range bomber force. It can rapidly deliver massive quantities of precision and non-precision weapons against any adversary, anywhere in the world, at any time.

(Image of wing test mechanism provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Icon Aircraft Bankruptcy Chooses A 'Winner' -- Appears to Be Chinese Ownership

'SG Investment America' Leads Small List Of Suitors News, Analysis and Opinion by ANN Editor-In-Chief, Jim Campbell The long, embarrassing saga of Icon Aircraft is entering a new c>[...]

'CLIMBING. FAST.' Campaign Builds Speed

Congressional Caucus Quickly Finds Fans in Business Aviation Community A dozen international Av-Biz stakeholders have responded to the establishment of the Congressional Sustainabl>[...]

Volato Chooses SmartSky for Internet Provisions

Future Operations to Sport End-to-End Internet Connectivity Throughout the Trip Volato has opted to go with SmartSky for its future inflight connectivity needs, selecting the Smart>[...]

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Surf Air Establishes Foothold in Brazil

Charter Operator Promises to Convert 4 of its Grand Caravans to Surf's Electric Propulsion Surf Air Mobility inked a memorandum of understanding with a Brazilian Caravan operator t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC