Falcon 9 Stands Tall At SLC-40 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 13, 2009

Falcon 9 Stands Tall At SLC-40

Rocket Raised Two Days Ahead Of Schedule

Space Exploration Technologies (SpaceX) announced this week its Falcon 9 launch vehicle was successfully raised to vertical on Saturday, January 10 at Space Launch Complex 40 (SLC-40) in Cape Canaveral, FL -- two days ahead of schedule. This operation was a critical step in validating a variety of system interfaces and launch processes in preparation for the maiden flight of Falcon 9 later this year.

"Any engineered system has requirements that can only be recognized through actual assembly of real hardware," stated Brian Mosdell, Director of Florida Launch Operations for SpaceX. "This rapid integration and stand-up provided our engineers and technicians with invaluable insights that will greatly streamline our effort towards the first Falcon 9 launch in 2009."

SpaceX completed the Falcon 9 vehicle integration in a horizontal position on December 30, 2008. After integration, Falcon 9 was lifted and mated to a transporter erector system, designed and built by SpaceX, which carried the 17 foot diameter, 180 foot long rocket to the launch pad.

On January 10 at 12:45 PM EST, SpaceX began the process of raising Falcon 9 and approximately 30 minutes later, Falcon 9 stood vertical at the Cape.

"This entire process has helped us validate key interfaces and operations prior to executing our launch campaign with the vehicle in its final flight configuration," said Elon Musk, CEO and CTO of SpaceX. "We encountered no show-stoppers or significant delays. I am highly confident that we will achieve our goal of being able to go from hangar to liftoff in under 60 minutes, which would be a big leap forward in capability compared with the days to weeks required of other launch vehicles."

This latest accomplishment follows closely on a series of recent successes for SpaceX. In November 2008, SpaceX successfully conducted a full mission duration firing of Falcon 9, validating SpaceX's use of nine engines on the first stage, as well as the ability to shut down engines without affecting the remaining engines.

In December 2008, NASA selected the Falcon 9 launch vehicle and Dragon spacecraft as the primary means of transporting cargo to and from the International Space Station after the Space Shuttle retires in 2010.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC