P-8A MMA Advances To Detailed Design | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Feb 20, 2006

P-8A MMA Advances To Detailed Design

NAVAIR’s P-8A Multi-mission Maritime Aircraft Team has officially entered its critical design phase.

Before PDR could be officially “closed”, the team had to resolve only nine action items following the program’s Preliminary Design Review (PDR) in November. The program’s Critical Design Review is scheduled for 2007.

“The fleet needs the P-8A MMA and this program continues to meet its scheduled milestones,” said Capt. Joe Rixey, program manager for NAVAIR’s Maritime Patrol and Reconnaissance Aircraft. “We are executing this program to our technical requirements on time and on budget to deliver the next generation anti-submarine warfare capability to the warfighter.”

At the PDR event, team leaders from NAVAIR’s P-8A Program joined their Boeing counterparts to brief a technical review board on the status of the P-8A Program in Seattle from Oct. 31 to Nov. 4, 2005. Technical review board membership consisted of select NAVAIR competency leadership and subject matter experts.

“Most technical review board members walked away from the P-8A PDR very impressed with how well prepared the program came to the event,” said Cmdr. Mike Moran, lead for the Navy’s P-8A MMA team. “A few even acknowledged that this event was another bench setting example for other programs to follow in terms of methodology and approach for their future technical reviews.”

Rear Adm. Jeff Wieringa, NAVAIR’s assistant commander for research and engineering, was the chairman of the review board that conducted the in-depth technical assessment to ensure the P-8A development was mature enough to proceed as planned into the detailed design phase.

“This is a high performing team,” Wieringa said. “It was an honor to chair the PDR.”

P-8A MMA is the Navy’s replacement platform for the P-3C Orion, securing the Navy’s future in long-range patrol. The primary mission of MMA is to provide persistent anti-submarine warfare (ASW). In addition, MMA will contribute to anti-surface warfare (ASuW) and intelligence, surveillance and reconnaissance (ISR) warfighting capabilities as defined in the Sea Shield and FORCEnet elements of the Navy’s Sea Power 21 concept. {ANN Thanks Renee Hatcher,
P-8A MMA Public Affairs]

FMI: www.navair.navy.mil/

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC