Embraer Rolls Out First Production E175 With Fuel Burn Improvements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Fri, Mar 14, 2014

Embraer Rolls Out First Production E175 With Fuel Burn Improvements

Company Says Fuel Consumption Cut By 6.4 Percent With Modifications

Embraer Commercial Aviation rolled out the first E175 featuring a range of aerodynamic improvements that reduce fuel burn compared to the previous production aircraft. The modifications include the introduction of a new wingtip, systems optimization, and streamlining of aerodynamic surfaces. The aircraft was presented to Embraer employees at a ceremony at the company’s São José dos Campos facility today. The first customer delivery of the E175 with the complete package of modifications is expected in the coming weeks.

The company says the modified E175 aircraft recorded impressive results during several months of performance trials. Fuel consumption on a typical flight is 6.4% lower than the original E175, exceeding earlier-reported savings of up to 5%.

“The 6.4% fuel consumption reduction demonstrates the expertise of our development and manufacturing teams and partners, and our commitment to provide our customers with the best product to keep them competitive,” said Paulo Cesar Silva, President & CEO of Embraer Commercial Aviation. “We are delivering, on schedule, an airplane unique to the market. With the most comfortable passenger cabin in the 70 to 90-seat category, the E175 is the airplane with the lowest operating cost in its class.”
 
In 2013, four airlines in the USA (Republic Airways, United Airlines, SkyWest Inc., and American Airlines Inc.) placed 177 firm orders, 60 re-confirmable orders and 277 options for the E175. Embraer says besides reduced fuel burn, other improvements to the current generation of E-Jets include longer maintenance intervals, increased productivity and lower maintenance costs. These improvements ensure that the airplane will remain competitive until the second generation of the jet, the E175-E2, goes into operation in 2020 when it will offer even greater operating efficiency.

(Image provided by Embraer)

FMI: www.embraer.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC