The Cuts Continue At Airbus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Tue, Nov 07, 2006

The Cuts Continue At Airbus

Will Reduce Subcontractors By 80 Percent

The cuts continue at European planemaker Airbus... which announced Monday it plans to slash the number of subcontractors used by the company by as much as 80 percent.

The move is the latest in Airbus's vast restructuring plan aimed at reducing costs. Airbus currently has nearly 3,000 subcontractors that supply components for the manufacturer's planes. The Toulouse-based planemaker wants to reduce that number to about 500... and pare down the number of design centers and shipping facilities from 80, to between four and eight.

"I can confirm the number of suppliers that will be cut, but for the time being I do not have any information on who will be cut and how the cuts will be made," said an Airbus spokesman.

But even that's not all. The London Times reports Airbus also hopes to slash its administrative costs by over $1 billion through 2010... and cut supply costs by $380 million dollars over the same period.

All this comes as the planemaker says it needs to sell 420 A380 superjumbos just to break even on the mammoth airliner. That number rose from 270 after the latest of three delays to the program was announced in September.

FMI: www.airbus.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC