Boeing Flies Third 787-9 Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Nov 21, 2013

Boeing Flies Third 787-9 Dreamliner

First Genx-Powered Airplane Flies Some Two Months After Inaugural 787-9 Flight

Boeing's third 787-9 Dreamliner, the first to be powered by General Electric GEnx engines. The third of three 787-9s dedicated to the test effort, ZB021 joined the fleet some two months from the inaugural flight of the first 787-9.

ZB021 took off from Paine Field in Everett, WA, at 1215 PST and landed 2 hours and 44 minutes later at Seattle's Boeing Field. Boeing will use ZB021 to test engine performance as well as airplane handling characteristics such as low-speed performance and braking.

The 787-9 test program continues to make great progress. The fleet flies regularly, with the second airplane now in Florida for climatic testing, and has accumulated more than 180 flight hours and more than 60 flights. In addition to the three dedicated airplanes, Boeing also will conduct some testing on two production airplanes, the first of which is in final assembly in Everett. 787-10 development also is on plan.

Boeing is on track to deliver the 787-9 to launch customer Air New Zealand in mid-2014. 26 customers have ordered 396 787-9s, accounting for approximately 40 percent of all 787 orders.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC