NASA Brings The Ares I-X Flight Test Rocket To Life | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Fri, Sep 18, 2009

NASA Brings The Ares I-X Flight Test Rocket To Life

Fist Test With All Systems Installed

The Ares I-X team at NASA's Kennedy Space Center in Florida has reached a significant milestone with the first electrical power-up of the test rocket on Sept. 11. Ares I-X and its simulated crew module and launch abort system are assembled on a mobile launcher platform at Kennedy in preparation for its targeted Oct. 31 flight test.

Power-up is the first application of power to all of the electronics boxes, including avionics, sensors and thrust vector control system, since the rocket segments arrived and were stacked at Kennedy. Testing ran for three days and concluded Sept. 14. The boxes were all powered up individually in Denver, but had not been tested since installation in the rocket with actual flight cabling.

"Powering up a new vehicle and having all of the systems 'talking' to each other is always a challenge. The power-up was a tremendous success, with all of the systems functioning nominally," said Bob Ess, Ares I-X mission manager.

Ares 1-X Assembled

The Ares I-X is wired with more than 700 sensors to gather data during the two-and-a-half minute flight test. The launch will provide NASA an early opportunity to test and prove hardware, facilities and ground operations. The data collected during the launch will allow NASA to gather critical data for Ares I and future launch vehicles.

FMI: www.ares.com

Advertisement

More News

Aero-News: Quote of the Day (05.28.24)

"Clearing this certification hurdle is a major step forward in providing European CJ customers with a solution that not only enhances their aircraft operations but can also extend >[...]

ANN's Daily Aero-Term (05.28.24): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (05.28.24)

Aero Linx: Vintage Sailplane Association The purpose of the Vintage Sailplane Association (VSA) is to promote the acquisition, restoration and flying of vintage sailplanes by its m>[...]

Airborne-NextGen 05.21.24: ‘Liberty Lifter’, Cavorite Flies!, Eurodrone

Also: AMA National Fun Fly, Skyfire SF2, Echodyne Gets BVLOS, Av Meteorology Reference General Atomics' run at developing the Liberty Lifter ground effect aircraft has been put to >[...]

Airborne 05.24.24: NPS Kills Rushmore Flyover, VAI v NYC, New Reno Home-Roswell!

Also: Samson Sky, CAF Great Plains Wing, New Cert Standards, Flying Start Day There are, occasionally, blisteringly dunderheaded bits of governmental incompetence to be found with >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC