AD: General Electric | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Feb 23, 2006

AD: General Electric

AD NUMBER: 2006-04-12
MANUFACTURER: General Electric
SUBJECT: Airworthiness Directive 2006-04-12
SUMMARY:
The FAA is superseding an existing airworthiness directive (AD) for General Electric Company (GE) CF34-3A1 and -3B1 series turbofan engines. That AD requires initial and repetitive visual inspections and eddy current inspections (ECIs) of certain stage 5 low-pressure turbine (LPT) disks and stage 6 LPT disks, installed in GE CF34-3A1 and -3B1 series turbofan engines. Those engines are installed in certain Bombardier Canadair Regional Jet (RJ) airplanes. This AD requires the same initial and repetitive visual inspections and ECIs, but adds SNs to the affected disk population for RJ airplanes. This AD also adds GE CF34-1 and -3 series turbofan engines with certain stage 5 and stage 6 LPT disks, to the applicability section. Those engines are installed in certain Bombardier Canadair Business Jet (BJ) airplanes. Also, this AD requires eventual replacement of the affected disks as terminating action to the repetitive inspections. This AD results from the discovery of an additional population of suspect stage 5 LPT disks and stage 6 LPT disks that could fail due to low-cycle fatigue cracking that may start at the site of an electrical arc-out on the disk. We are issuing this AD to prevent low-cycle-fatigue (LCF) failure of stage 5 LPT disks and stage 6 LPT disks, which could lead to uncontained engine failure.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC