United Continental's Second Dreamliner Delayed Indefinitely | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Nov 02, 2012

United Continental's Second Dreamliner Delayed Indefinitely

Was To Have Been Available To Carry Passengers November 4th

United Continental Holdings, which took delivery of its first Dreamliner September 24, was supposed to have had a second 787 ready to enter service November 4th. But that delivery has been indefinitely delayed for unspecified reasons.

Bloomberg Business Week reports that United spokeswoman Christen David said that the airline was told by Boeing that the second airplane "is not ready for delivery as scheduled," and "we believe subsequent aircraft could be delayed as well."

Boeing spokesman Tim Bader told Bloomberg that the planemaker is "working diligently to complete United Airline's next 787 for delivery," but that finishing the airplanes is "taking a few days longer than anticipated."

United was scheduled to take delivery of five Dreamliners this year. The airline said it will use a 777 to fly the routes that were supposed to be flown by the second Dreamliner, and will offer refunds to those passengers who had booked flights specifically because they would be flying on the new airplane.

As early as last week, Boeing told analysts and investors during a conference call that United's Dreamliner delivery schedule was on track. United was notified of the delay October 26th, and no new timeline for the deliveries has been announced.

FMI: www.boeing.com, www.united.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC