AD: Bombardier | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Aug 22, 2005

AD: Bombardier

AD NUMBER: 2005-13-35
MANUFACTURER:
Bombardier
SUBJECT: Airworthiness Directive 2005-13-35
SUMMARY: The FAA is superseding an existing airworthiness directive (AD), which applies to all Bombardier Model DHC-8-100, DHC-8-200, and DHC-8-300 series airplanes. That AD currently requires installation of a placard on the instrument panel of the cockpit to advise the flight crew that positioning of the power levers below the flight idle stop during flight is prohibited. Additionally, the existing AD requires eventual installation of an FAA approved system that would prevent such positioning of the power levers during flight. Installation of that system terminates the requirement for installation of a placard. This new AD requires operators who have incorporated a certain Bombardier service bulletin to perform repetitive operational checks of the beta lockout system and to revise the Airworthiness Limitations document. This AD is prompted by in-service issues reported by operators who incorporated Bombardier Service Bulletin 8-76-24 as an alternative method of compliance to the existing AD. We are issuing this AD to prevent the inadvertent activation of ground beta mode during flight, which could lead to engine over speed, engine damage or failure, and consequent reduced controllability of the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20051335

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC