Return To Flight On Track | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jun 05, 2005

Return To Flight On Track

Ahead Of Schedule Even

Discovery was disconnected from its external tank and Solid Rocket Boosters Thursday and lowered by crane onto the Orbiter Transporter System in the Vehicle Assembly Building. The orbiter is scheduled to move and be attached to its new tank (ET-121) on June 6th.

The new heater installed on the tank should minimize the potential for ice buildup. Technicians then plan to work the final closeouts on the Shuttle and hook up liquid oxygen and liquid hydrogen systems and conduct an interface verification test. Discovery is scheduled to return to the launch pad on June 13th, one day earlier than planned.

Power-up testing continues on Atlantis in the Orbiter Processing Facility as it prepares for its mission to the International Space Station. Closeouts are also continuing. Atlantis is scheduled to roll from the processing facility to the Vehicle Assembly Building in mid-July.

Technicians are testing the Orbiter Maneuvering System and Forward Reaction Control System and will begin cleaning the payload bay next week. The third redesigned External Tank (ET-119) should be shipped from the Michoud Assembly Facility in New Orleans on June 9th, arriving about five days later. ET-119 might fly with Atlantis on its mission.

FMI: www.nasa.gov/returntoflight

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC