Within 100 Meters: UC Irvine Gets NASA/JPL Contract For Pinpoint Mars Landings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 03, 2004

Within 100 Meters: UC Irvine Gets NASA/JPL Contract For Pinpoint Mars Landings

Professor Kenneth Mease Will Lead Team in Developing Advanced Guidance Algorithms

UC Irvine Monday announced that a researcher within The Henry Samueli School of Engineering has been awarded a contract with NASA, through the Jet Propulsion Laboratory (JPL) to develop guidance algorithms aimed at pinpointing future Mars landers within 100 meters of the desired site.

Kenneth Mease, a professor of mechanical and aerospace engineering, is the principal investigator for the three-year project, a collaborative effort involving his research group and researchers at JPL.

"Pinpointing a Mars landing to within 100 meters enables science instruments to be delivered close to gullies, rock outcrops or canyon walls. Without pinpoint accuracy, landing near such scientifically interesting objects would be too risky," said Mease. "Mars missions to date have at best been capable of landing within 20-30 kilometers of a target site. Achieving pinpoint accuracy requires automated on-board guidance during the atmospheric flight and the terminal powered descent."

Mease's team will develop an algorithm to control a Mars lander's flight during the "hypersonic entry phase" to compensate for variations in atmospheric conditions and vehicle performance, and deliver the vehicle with pinpoint accuracy to the parachute deployment point. He is also developing a guidance algorithm that will steer the lander during the "powered-descent phase" to compensate for wind drift during the parachute phase. Comprehensive real-time simulation testing of the algorithms in flight-like processors will be conducted at JPL. The first demonstration of pinpoint landing is under consideration for a Mars mission in 2011.

The total contract value is $679,000.

FMI: www.eng.uci.edu

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC