DOD Details VXX Work Split Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Jan 30, 2005

DOD Details VXX Work Split Locations

Over A Third Of The Work To Be Performed Outside The United States

The Department of Defense has issued a statement detailing the amount of work that will be performed on the Lockheed-Martin VXX presidential helicopter replacement, by city, state and country.

The Systems Development and Demonstration phase of the contract, which ANN previously reported totalled just under $1.8 billion, consists of engineering design and integration work for the myriad communications, navigation and mission systems required to perform the support mission for the President of the United States.

The phase also includes a comprehensive test and evaluation program, and production of five aircraft to introduce the operational capability. The locations where the SDD work will be performed, and the percentage of work assigned to each, are:

  • Owego (NY), 31 percent
  • Amarillo (TX), 27 percent
  • Yeovil, United Kingdom, 21 percent
  • Agusta, Cascina Costa, Italy, 15 percent
  • Lynn (MA), 3 percent
  • Rancho Santa Margarita (CA), 1 percent
  • Grand Rapids (MI), 1 percent
  • Denton (TX), 1 percent

The SDD phase is expected to be completed by September 2011, and the contract funds for the program will not expire at the end of this fiscal year. The contracting activity for this program is the Naval Air Systems Command, Patuxent River (MD).

FMI: www.dod.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC