GA-ASI Maximizing Fuel Capacity For MQ-25 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jul 14, 2018

GA-ASI Maximizing Fuel Capacity For MQ-25

Integrated Fuel Tank Structure Improves Fuel Carriage And Delivery Capacity

General Atomics Aeronautical Systems, Inc. (GA-ASI) is using an integrated fuel tank structure to maximize fuel offload for the proposed MQ-25 unmanned aerial refueling aircraft for the U.S. Navy. GA-ASI applied its knowledge of advanced composite aircraft structures to develop integrated fuel tanks in a large-scale wing box test article and a full-scale wing skin pre-production validation article.

The wing box tested to failure via wing bending at GA-ASI’s Adelanto, Calif. structural test facility in November 2017. In April, the company verified the production readiness of the co-cured wing and tail components using both non-destructive and destructive inspections.

“The integral fuel tank wing box test article will reduce technical and schedule risk for the program,” said David R. Alexander, president, Aircraft Systems, GA-ASI. “Specifically, through extensive validation of fuel containment sealing methods, advanced non-linear buckling finite element analysis models and thick composite laminate construction, we have accelerated engineering design consideration prior to the detail design phase and production.”

A full-scale inner-wing skin demonstration article built in March at GA-ASI’s Spanish Fork, Utah facility verified the MQ-25 tooling concepts, lamination approach, and processes. The team validated the outer mold line tooling approach for the build process which enables accelerated engineering and tooling fabrication for the MQ-25 program.

(Source: GA-ASI news release. Image from file)

FMI: www.ga-asi.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC