Modernization Work Begins In Naples On G.222s For Afghanistan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Nov 04, 2008

Modernization Work Begins In Naples On G.222s For Afghanistan

Predecessors To Today's Spartans Refurbished With New Avionics, Interiors

The refurbishment and modernization of 18 G.222s, purchased by the United States Air Force and destined for the re-established Afghan Air Force, has begun at Alenia Aeronautica’s Capodichino plant in Naples.

On September 30, Alenia North America signed a $287 million contract to provide 18 refurbished and modernized G.222 aircraft. The aircraft were previously in service with the Italian Air Force and reacquired by Alenia Aeronautica in conjunction with the Italian Air Force’s acquisition of a new fleet of C-27J Spartans.

The aircraft are to be modernized at Capodichino with state of the art avionics and general improvements according to the specific requirements of the United States Air Force. Two of these craft will be outfitted for a VIP soundproof module and equipped with seats, desks and a pantry so as to be used for the transport of Afghan leaders.

Four G.222s, sent from Pisa and Pratica di Mare air bases, have already arrived at Capodichino to begin the refurbishment and modernization process. The eighteen G.222s to be provided to the Afghan National Army Air Corps were produced between 1977 and 1985 in several avionic and cockpit configurations. As part of the modernization effort, all 18 will be upgraded to a standard avionic and system configuration, with a new autopilot system, ballistic protection and new maintenance operations. The refurbishment and modernizations are anticipated to last between 12 and 15 months per aircraft.

The first refurbished and modernized G.222 will be delivered to the Combined Security Transition Command in Afghanistan halfway through 2009 and the entire supply will be complete by 2011.

Today's version of the G.222, the C-27J Spartan, was recently selected by the US Army and Air Force for the Joint Cargo Aircraft (JCA) Program.

FMI: www.aleniana.com/

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC