A350-1000 Performed ‘High And Warm’ Flight Test Campaign In Latin America | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 30, 2017

A350-1000 Performed ‘High And Warm’ Flight Test Campaign In Latin America

Airplane Evaluated At Airports Up To 13,000 Feet

With the objective of conducting a ‘High and Warm’ flight test campaign to check aircraft and engine performance in high-altitude, warm and humid conditions, the A350-1000 MSN071 test aircraft flew first to Bolivia before completing its tour in Colombia and then returning to Toulouse, France, after 10 days of flight and ground tests.

The flight test campaign took place at three different airports: Cochabamba at an altitude of 8,300ft (2,350m), La Paz at 13,300ft (4,054m) and Barranquilla at sea level, with temperatures ranging between 8°C and 32°C

The aircraft took-off and landed several times at each airport to collect data.

Early test results confirm the good performance and behavior of both the aircraft and its Trent XWB-97 engines. This is a major successful milestone in the aircraft certification flight test campaign.

The A350-1000 is ready for high altitude operations from Entry Into Service later this year.
All three A350-1000 flight test aircraft (MSN059, MSN071 and MSN065) are engaged in the ongoing Type Certification campaign, during which the aircraft is pushed to extreme limits well beyond what they should ever face during normal in-service operations.

(Image provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC