NASA Sets Target Date For Ares I-X Rocket's Test Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Sep 23, 2009

NASA Sets Target Date For Ares I-X Rocket's Test Launch

Ares I-X Is Stacked, Testing Continues

NASA is targeting Tuesday, October 27th, for the flight test of the Ares I-X rocket, pending successful testing and data verification. Senior managers made the decision after a meeting Monday at NASA Headquarters in Washington.

The target date has been confirmed with the Air Force's Eastern Range. The launch window will extend from 0800 to 1200 EDT. There is another launch opportunity on October 28th. The date will be finalized at a Flight Test Readiness Review scheduled for October 23rd at NASA's Kennedy Space Center in Florida.

Technicians at Kennedy have completed the stacking, or assembly, of the rocket on a mobile launch platform. This week, Ares I-X team members are conducting a launch countdown simulation and conducting final checks of the rocket's systems. The checks will begin with the launch abort system simulator atop the rocket and continue down to its aft skirt. The rocket is targeted to roll out to Kennedy's Launch Pad 39B on October 19th.

Assembled Ares 1-X NASA Photo

The launch will provide NASA with an opportunity to test and prove hardware, facilities and ground operations, while gathering critical data for the Ares I rocket and future launch vehicles.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC