SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 12, 2010

SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral

Preparations Continue For Inaugural Launch

Space Exploration Technologies (SpaceX) says that all of the flight hardware for the debut launch of the Falcon 9 vehicle has arrived at the SpaceX launch site, Space Launch Complex 40 (SLC-40), in Cape Canaveral, Florida.

Final delivery included the Falcon 9 second stage, which recently completed testing at SpaceX's test facility in McGregor, Texas. SpaceX has now initiated full vehicle integration of the 47 meter (154 feet) tall, 3.6 meter (12 feet) diameter rocket, which will include a Dragon spacecraft qualification unit.

"We expect to launch in one to three months after completing full vehicle integration," said Brian Mosdell, Director of Florida Launch Operations for SpaceX. "Our primary objective is a successful first launch and we are taking whatever time necessary to work through the data to our satisfaction before moving forward."

Following full vehicle integration, SpaceX will conduct a static firing to demonstrate flight readiness and confirm operation of ground control systems in preparation for actual launch.

Artist's Rendering

Though designed from the beginning to transport crew, SpaceX's Falcon 9 launch vehicle and Dragon spacecraft will initially be used to transport cargo. Falcon 9 and Dragon were selected by NASA to resupply the International Space Station (ISS) once Shuttle retires. The $1.6B contract represents 12 flights for a minimum of 20 tons to and from the ISS with the first demonstration flights beginning in 2010.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC