TSB Issues Safety Warning To Transport Canada About Challenger II Ultralight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Nov 20, 2018

TSB Issues Safety Warning To Transport Canada About Challenger II Ultralight

Wing Attachment Bracket Failed In Flight Resulting In A Fatal Injury In July

The Canadian Transportation Safety Board has issued a letter to Transport Canada concerning the in-flight breakup of a Quad City Challenger II Advance Ultralight aircraft that resulted in the fatal injury of the pilot in July.

According to the letter, which was posted online by the Canadian Owners and Pilots Association, the TSB determined that the bracket securing the right front lift strut to the fuselage failed while in flight as the result of metal fatigue. The failure caused the right wing to separate from the aircraft.

According to the report, the bracket had accumulated 402.2 hours when the failure occurred. The fatigue crack began at the bolt hole, and a "significant number" of secondary and parallel cracks were found underneath the surface of the bracket.

In the letter, the TSB says it is in the process of examining a number of strut attachment brackets from other Quad city Challenger II aircraft. So far, 22 brackets have been examined and eight have been found to have cracks. The time in service of the cracked brackets ranges from 41 to 830 hours, according to the letter.

The TSB said in the letter that it "encourages your organization to take the necessary steps to reduce the likelihood that the bracket failure identified in this occurrence reoccurs. The TSB would appreciate being advised of any action that is taken in this regard."

(Image from file)

FMI: COPA

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC