Ariane 5 On Track For Next Month's Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Sep 25, 2016

Ariane 5 On Track For Next Month's Mission

Pace Of Pre-Flight Activities Increasing At Spaceport In French Guiana

Pre-flight activities for Arianespace’s upcoming Ariane 5 mission are ramping up at the Spaceport in French Guiana, with launcher and payload preparations advancing in parallel for the October 4 liftoff.

In a major milestone reached this month, Ariane 5 was rolled out from the Spaceport’s Launcher Integration Building – where its core cryogenic stage, two solid boosters and cryogenic upper stage were mated – to the Final Assembly Building. This process formally transferred authority for the heavy-lift vehicle to Arianespace from production prime contractor Airbus Safran Launchers.

With Ariane 5 now under Arianespace’s responsibility, the launcher is in position to receive its two passengers: the Sky Muster II and GSAT-18 telecommunications satellites, both of which were fueled earlier this month inside the Spaceport’s S5 payload preparation facility.

The October 4 mission with Ariane 5 is designated Flight VA231 in Arianespace’s numbering system, and it will deliver the two spacecraft to geostationary transfer orbit.

There will be two payloads on board for the launch. Built by SSL (Space Systems Loral) for the Australian national broadband network (nbn), Sky Muster II will utilize advanced-design multiple spot beams to help bridge the digital divide for some 400,000 homes and businesses in regional and remote areas of the country.

Sky Muster II is one of the world’s largest communications platforms with a liftoff mass estimated at 6,400 kg. Its launch follows the orbiting of nbn’s first Sky Muster satellite on an Arianespace Ariane 5 mission performed in September 2015.

Flight VA231’s second passenger – GSAT-18 – is a telecommunications spacecraft developed by the Indian Space Research Organisation (ISRO). Once in orbit, it will serve as a replacement for operational satellites that currently provide key national services in multiple frequency bands – to be joined by GSAT-17, which will be orbited on a future Ariane 5 mission from the Spaceport in French Guiana.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC