AD: Airbus Defense and Space S.A. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 14, 2018

AD: Airbus Defense and Space S.A. Airplanes

AD NUMBER: 2018-18-10

PRODUCT: All Airbus Defense and Space S.A. Model CN-235, CN-235-100, CN-235-200, CN-235-300, and C-295 airplanes.

ACTION: Final Rule.

SUMMARY:  This AD was prompted by reports that cracks were found on the door mechanism actuator shaft assemblies of the nose landing gear (NLG).

This AD requires repetitive inspections of the NLG door mechanism actuator shaft assemblies having certain part numbers, and corrective actions if necessary.

This AD would also provide an optional terminating action for the repetitive inspections for Model CN-235, CN-235-100, CN-235-200, and CN-235-300 airplanes.

DATES: This AD is effective October 18, 2018.

COST: The FAA estimates that this AD affects 14 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections - 21 work-hours × $85 per hour = $1,785 per inspection cycle. Parts - N/A. Total coat $1,785 per aircraft per inspection cycle.
  • Modification for Model CN-235 airplanes - 10 work-hours × $85 per hour = $850. Parts $33,626. Total cost per aircraft - $34,476.
  • Replacement - 14 work-hours × $85 per hour = $1,190. Parts - $18,720. Total cost per aircraft - $19,910.
FMI: AD

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC