Boeing 777X Entry Into Service May Be Delayed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Sat, Jun 08, 2019

Boeing 777X Entry Into Service May Be Delayed

Company Working To Resolve Issues With The GE9X Engines, Carbon-Composite Wings

The entry into service of the Boeing 777X may be delayed beyond its projected June, 2020 date due to issues with the GE9X engine and the airplanes carbon-composite wings, according to industry sources.

Reuters reports that Boeing CFO Greg Smith said at a recent conference that while the 2020 EOS is still "the current assumption" there are still some challenges with the GE engine, which that company is working through "so we are having to do some re-testing."

There are two 777X flight test aircraft that are in integrated system testing on the ground, and the next two flight test aircraft are in final assembly, according to Boeing CEO Dennis Muilenburg. The first flight of the airplane had been planned for later this month, but that date may slip as well. Airline sources at an industry meeting in Seoul, South Korea this week said that the issues may delay the first delivery of the 777X to a customer, which is now more likely to be completed late in 2020, and could be a far out as sometime in 2021.

GE is flight testing the engine after a three-month delay necessitated by a problem with its compressor. The GE9X engine is the largest of its type to be developed. The company did not respond to a request for a comment from Reuters.

The 777X would be the largest twin-engine airliner flying. But industry analysts say that demand for widebody jets has been falling due to oversupply, concerns about the economy and trade disputes.

(Images from file)

FMI: Source report

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

Airborne 05.28.24: Jump Plane Down, Starship's 4th, Vision Jet Problems

Also: uAvionix AV-Link, F-16 Viper Demo, TN National Guard, 'Staff the Towers' A Saturday afternoon jump run, originating from SkyDive Kansas City, went bad when it was reported th>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC