Eurofighter DA1 Prototype Gets A Nose Job | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 03, 2010

Eurofighter DA1 Prototype Gets A Nose Job

Radome Delivered For The European-Designed Aircraft, Now A Museum Piece

Eurofighter has delivered to the Deutsche Museum Flugwerft Schleissheim, Germany, a "real" radome for Eurofighter prototype DA1.

|
Eurofighter Prototype DA1 In The Deutsche Museum Flugwerft 

The DA1, equipped with Turbo Union RB.199 engines, made its maiden flight from EADS' Manching test facility, Germany, on 27 March 1994 and was decommissioned on 21 December 2005.

Displayed since 2007 in the museum close to Munich, the Eurofighter prototype had been delivered by EADS without its original radome. The only solution for the Museum was to build a makeshift radome, similar to the original one. Now Eurofighter, with the help of NETMA, BAE Systems and EADS Manching, have donated to the museum a real radome that has now been installed on the DA1 to complete the aircraft's appearance.


Eurofighter Typhoon

Not just an aerodynamic cover for the radar antenna, the Eurofighter radome is another example of high technology on the aircraft. Made in reinforced fiberglass and weighing around 65 kilos, the radome is produced to a very tight standard with small levels of tolerances because its internal and external surfaces have to be perfectly symmetrical, coping with the complex requirements of the polarisation of the antenna. Every radome is produced in different stages, with parts manufactured in Italy and Spain, full assembly taking place in Germany and the UK, before being delivered to the final assembly lines in the four partner nations of the Eurofighter program.

FMI: www.eurofighter.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC