Certifiable Predator B Fuselage Integration Begins | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jul 11, 2016

Certifiable Predator B Fuselage Integration Begins

Marks First Step Of Physical Production; Flight Testing Planned For Late 2016

General Atomics Aeronautical Systems, Inc. (GA-ASI), a leading manufacturer of Remotely Piloted Aircraft (RPA) systems, radars, and electro-optic and related mission systems solutions, today announced that fuselage integration of its new Certifiable Predator B (CPB) RPA system in now underway.

“The start of fuselage integration for the CPB aircraft represents a significant milestone in our progression towards building a certifiable platform,” said Dave R. Alexander, president, Aircraft Systems, GA-ASI. “CPB will provide a next-generation capability, integrating enhanced safety and reliability systems that will enable RPA flight within civilian airspace, ushering in a new era in unmanned aviation.”

During fuselage integration, numerous components will be installed, including brackets and mounting hardware, electrical cables, fuel systems, oil and cooling systems, landing gear,  avionics hardware and software, and a propulsion system.

The next major phase of the aircraft assembly effort consists of wings and tails integration, which is planned for summer 2016, to be followed by complete electrical factory testing.

Upon successfully completing all installations and inspections, the aircraft will undergo power checks, fuel checks, and a complete system check. Lastly, ground verification testing will be conducted prior to first flight of the CPB prototype aircraft. Flight testing is planned for late 2016.

(Source: GA-ASI news release. Image from file)

FMI: www.ga-asi.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC