Elements For The First A350 XWB Horizontal Tail Begin To Take Shape | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.16.24

Airborne-NextGen-09.17.24

Airborne-Unlimited-09.18.24

Airborne-FlightTraining-09.19.24

Airborne-Unlimited-09.20.24

Tue, Aug 02, 2011

Elements For The First A350 XWB Horizontal Tail Begin To Take Shape

Finished Elements Will Be Shipped To Toulouse, France For Final Assembly

Production on a key component in the A350 XWB’s initial horizontal tail plane has begun, marking a new industrial milestone for Airbus’ new-generation widebody jetliner family. This activity is being performed at Airbus’ centre of excellence in Puerto Real, Spain, and involves build-up of the horizontal tail plane’s lateral box in a combined effort with primary partner company Aernova.

Measuring some 30 feet long and from 4.5 and about 13 feet wide, the A350 XWB horizontal tail plane’s lateral box is composed primarily of carbon fibre – with its few metal components made of titanium alloys and aluminium.

After assembly is complete, the lateral boxes will be sent to Airbus’ facility in Getafe, Spain – where production of additional A350 XWB components is underway – for joining with the elevators and completion of the horizontal tail plane. The finished element then is to be transferred to the jetliner’s final assembly line in Toulouse, France. 

Airbus’ Puerto Real facility is used for the automated assembly of movable surfaces, final equipment processes and delivery of large structural components to the final assembly line in Toulouse. Its own assembly capabilities consist of a mobile line spread across five interlinked stations: main structure and trailing edge assembly; structural assembly of lateral boxes; automated drilling and riveting; trailing edge equipment; and final operations.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (09.17.24): Instrument Approach Procedure (IAP) Charts

Instrument Approach Procedure (IAP) Charts Portray the aeronautical data which is required to execute an instrument approach to an airport. These charts depict the procedures, incl>[...]

Aero-News: Quote of the Day (09.17.24)

“Our industry is approaching a 30-year innovation cycle, and we have less than 25 years to decarbonize aviation. We need to develop new methods to get net zero aerospace tech>[...]

Airborne 09.16.24: Bristell Shooting, EAA v FAA, Boeing Strike!

Also: Girls in Aviation Day, B-29 Doc Heads 4 Chino, C-17 Tail Cone Detaches, Bulgaria Airshow Accident One of two private aircraft that launched from Apatity Airport near Murmansk>[...]

Classic Aero-TV: CubCrafters NX Cub-A Stunning Effort To Build The ‘Perfect Cub'

From 2021 (YouTube Version): We Were Blown Away At How Well The Nosewheel Was Adapted To The X Cub Airframe It should not be a secret to any one of you, that with thousands of hour>[...]

Airborne 09.18.24: Boom XB-1 3rd Test, DJI Ban, SubSonex To EAA Museum

Also: Volato Nixed by Honda, New B-21 Bases, A-10 Unit Inactivated, Gogo/Airshare Boom Supersonic announced its demonstrator aircraft XB-1 successfully completed its third test fli>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC