AW609 Program Moves Forward Preparing For Icing Trials | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 10, 2017

AW609 Program Moves Forward Preparing For Icing Trials

Several Ground And Flight Tests Already Performed In Philadelphia By The Third AW609 Prototype

The AW609 TiltRotor program is expected to start icing trials soon following recent ground and flight testing activities. These advances have been made in support of FAA certification, which remains on track for 2018.

 The third prototype, based at Leonardo’s facility in Philadelphia, performed several weeks of unrestrained ground testing and, more recently, flight trials that allowed avionics and all systems to be fully tested. During initial flights, the aircraft performed basic hovering and maneuvering and patterns around the airport, concluding with hover landing. Additional flights up to altitudes of 4000 feet with short takeoff and landing (STOL) are planned shortly.
 
The aircraft will undergo icing trials in Marquette, Michigan, through the winter. The tests will ensure the AW609 can fly in known icing conditions and reach operational standards not currently available in any other commercial aircraft.
 
The fourth AW609 prototype is now located within the main production area of the Philadelphia facility’s assembly line to ensure a smooth transition to the first production aircraft, also planned for 2018.

(Source: Leonardo Company news release. Image from file)

FMI: www.leonardocomapny.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC