AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Sep 19, 2019

AD: The Boeing Company Airplanes

AD NUMBER: 2019-18-03

PRODUCT: Boeing Model 737 series airplanes, excluding Model 737-100, -200, -200C, -300, -400, and -500 series airplanes.

ACTION: Final rule; request for comments.

SUMMARY: This AD requires revising the existing maintenance or inspection program to remove text that allows the size of the thrust reverser upper locking actuator lock sensor target to be changed, and, for certain airplanes, performing repetitive integrity tests of the thrust reverser upper locking actuator.

This AD was prompted by a report indicating that alteration of thrust reverser upper locking actuators in accordance with certain data in the Boeing aircraft maintenance manual (AMM) could delay or prevent detection of the failure of the locking mechanism of a thrust reverser upper locking actuator.

DATES: This AD is effective October 3, 2019. Comments must be received by November 4, 2019.

COST: The FAA estimates that this AD affects 2,149 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Integrity test (2,039 airplanes):

  • Labor: 8 work-hours × $85 per hour = $680 per test cycle per airplane.

Actuator replacement (if required)

  • Labor: 8 work-hours × $85 per hour = $680.
  • Parts: $38,908.
  • Cost per Airplane: $39,588.

According to the manufacturer, some or all of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC