London Mayor Blasts Government Aviation Policy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Oct 08, 2012

London Mayor Blasts Government Aviation Policy

Says More Airport Capacity Is Necessary For City, Nation To Thrive

The Mayor of London says the government's delays in making decisions about runway capacity are leading the city down a path to "economic catastrophe."

Speaking to a group of business leaders in London, Mayor Boris Johnson said that the government's plan to release an independent study on airport capacity by 2015 is "far too slow," and that he expects that European countries will use the delay to gain an economic advantage over the U.K.

But Johnson is not a proponent of a third runway at Heathrow, according to a report from the U.K. Press Association. He favors the four-runway airport plan proposed for the Thames Estuary, or possibly at Stanstead airport in Essex.

In his speech, Johnson said that the third runway at Heathrow would be an interim solution at best. But he said that the "inertia" of the U.K. government was being "fully exploited by our European rivals who already possess mega-hub airports."

Johnson said he plans to continue to work with the Davies Commission which is studying the issue, but says that waiting until 2015 for a report does not reflect the urgency of the situation. He said that the land required for a four-runway hub ruled out such locations as Heathrow, Gatwick Birmingham, and Luton.

Mayor Johnson said that building the facility would likely cost between $121 and $129 billion, but added that in the right circumstances, it could be privately financed and run as a "commercially viable business."

(Artist's rendering of proposed Thames Estuary airport)

FMI: www.london.gov.uk/who-runs-london/mayor

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC