Boeing Moves 787 Static Test Airframe To Testing Rig | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Apr 26, 2008

Boeing Moves 787 Static Test Airframe To Testing Rig

Stress Testing To Start This Summer On Dreamliner

It was a small trip, but also a major leap. On Friday, Boeing moved the 787 Dreamliner static test airframe from its Final Assembly facility in Everett, WA to its structural test rig, located only 1,000 feet away from Final Assembly at the Everett factory.

While some assembly remains to be completed on the static airframe, Friday's move represents the imminent start of static testing of the first composite-bodied airliner. Test set up is expected to begin immediately, with tests commencing this summer.

"During static tests we apply loads to the airplane structure that simulate both normal operation as well as extreme flight conditions," said Randy Harley, vice president of Engineering & Technology for the 787 program. "We monitor the airplane to confirm analytical predictions and make sure the structure holds up to these conditions."

Boeing also notes movement of the static airframe clears the way to begin assembly of the third 787 to enter the flight test program. Most pieces of the third airplane arrived in Everett earlier this month.

All assemblies for Airplane #3 are now in Everett, and the airplane will be loaded into the first position of Final Assembly early next week.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC