AD: Airbus Helicopters Deutschland GmbH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 05, 2018

AD: Airbus Helicopters Deutschland GmbH Helicopters

AD NUMBER: 2018-20-09

PRODUCT: Airbus Helicopters Deutschland GmbH (Airbus Helicopters) Model MBB-BK 117 C-2 and MBB-BK 117 D-2 helicopters.

ACTION: Final Rule.

SUMMARY:  This AD requires altering and re-identifying the overhead panel shock mount assembly (shock mount).

This AD was prompted by the manufacturer's stress recalculations.

DATES: This AD is effective November 7, 2018.

COST: The FAA estimates that this AD affects 144 helicopters of U.S. Registry. The FAA estimates that operators may incur the following costs in order to comply with this AD:

  • Labor costs are estimated at $85 per work-hour.
  • Installing retaining plates and re-identifying the four shock mounts takes about 3 work-hours and parts cost about $184 for a total estimated cost of $439 per helicopter and $63,216 for the U.S. fleet.
  • According to Airbus Helicopter's service information, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. The FAA does not control warranty coverage by Airbus Helicopters. Accordingly, all costs have been included in the cost estimate.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC