TRU Simulation + Training Qualifies Second Boeing 737 MAX FFS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, May 04, 2017

TRU Simulation + Training Qualifies Second Boeing 737 MAX FFS

Receives Type VII Qualification From CAAS

TRU Simulation + Training has completed ICAO 9625 Edition 4 Interim Type VII qualification of the Boeing 737 MAX Full Flight Simulator (FFS) by the Civil Aviation Authority of Singapore (CAAS) at the Boeing Training Campus in Singapore. The device received qualification on March 30, 2017.

The successful qualification marks the second of four 737 MAX Full Flight Simulators that TRU will deliver to Boeing’s worldwide network of training campuses this year. The first system is currently operational at Boeing’s campus in Miami, FL and is part of 10-year training agreement under which TRU will deliver multiple 737 MAX FFS suites to Boeing’s global network of training campuses.

“TRU is committed to the timely and efficient delivery and qualification of these truly world-class, state-of-the-art 737 MAX FFS suites to Boeing Training Campuses,” said George Karam, Vice President and General Manager of TRU’s Air Transport Simulation Division. “Our agreement with Boeing further enhances TRU’s position and reputation as a leading training systems supplier to global aircraft manufacturers and their airline customers.”

The 737 MAX FFS incorporates the TRU Horizon distributed I/O system that converts complex electronic signals into a single universally-used output that allows the integration of real aircraft panels without requiring modification. This innovative approach yields other advantages, including: reduced overall weight to optimize motion capabilities; requires 80 percent less wiring than traditional simulation devices; reduced simulator downtime; reduced spare parts requirements; provides a turnkey solution that is less expensive and easier to maintain.

(Source: Textron news release. Image from file)

FMI: www.textron.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC