U.S. Army Awards LMC Apache Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Aug 16, 2015

U.S. Army Awards LMC Apache Contract

Will Upgrade Helicopter Targeting And Pilotage System

The U.S. Army has awarded Lockheed Martin a $21.7 million Lot 4 follow-on contract to continue production of the Modernized Day Sensor Assembly (M-DSA) for the AH-64E Apache attack helicopter.

This first phase of upgrades to modernize the Apache’s Day Sensor Assembly includes producing Modernized Laser Rangefinder Designator (M-LRFD) kits. M-LRFD is the principal targeting aid for the Apache, enabling pilots to designate targets and establish target range for accurate weapon engagement. M-DSA is an upgrade to the Apache’s targeting and pilotage system, or Modernized Target Acquisition Designation Sight/Pilot Night Vision Sensor (M-TADS/PNVS).
 
A total of $21.7 million was obligated to Lockheed Martin through this Lot 4 contract award; the total value is not-to-exceed $50.9 million. Lockheed Martin is on contract to produce and deliver 786 M-LRFD kits for the U.S. Army and international customers. More than 200 kits have been delivered to the U.S. Army to date.
 
“We are currently fielding laser kits as part of the M-DSA Phase 1 upgrade and are on track to equip approximately seven Apache battalions a year,” said Matt Hoffman, M-TADS/PNVS director at Lockheed Martin Missiles and Fire Control.
 
In addition, Lockheed Martin has already qualified M-DSA Phase 2 upgrades and is ready to transition into production. Phase 2 M-DSA upgrades allow Apache pilots to see high-resolution, near infrared and color imagery on cockpit displays. Phase 2 upgrades also include a new laser pointer marker and a multi-mode laser with eye-safe lasing capability. These improvements allow for better coordination with ground troops and safe flight in urban environments and during training exercises.

(Image from file)

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC