U.S. Navy Awards $16 Million For F/A-18 Mission Computers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Sep 23, 2014

U.S. Navy Awards $16 Million For F/A-18 Mission Computers

General Dynamics Using COTS Technology And Open Architecture For The Airplanes

The U.S. Navy has awarded a contract worth $16.2 million contract to General Dynamic to produce Type-3 Advanced Mission Computers (AMC) for the F/A-18 E/A-18G Super Hornet aircraft. Since 2002 General Dynamics has produced, tested and delivered the F/A-18 AMC, which serves as the nerve center of the Super Hornet and provides the Navy with situational awareness and combat systems control.

"By leveraging commercial off-the-shelf technologies and an open architecture, we are helping the Navy keep lifecycle costs down, while strengthening mission-critical performance capabilities for the flight crew," said John van Dyke, senior director, Sensors and Processing at General Dynamics Advanced Information Systems. "We look forward to continuing to provide the Navy with our cost-effective, low-risk solution that addresses obsolescence, increases flexibility and helps the nation and its allies advance their mission."

Under the contract, General Dynamics will produce, build, test and deliver the Type-3 AMCs to the U.S. Navy and Australia. Designed to operate in extreme environmental conditions, the ruggedized, high-performance AMC processes high-speed data rates from aircraft sensors. The integrated information processing system also performs general purpose, input/output, video, voice and graphics processing, and is configurable to any operating environment.

This contract will be performed primarily at the General Dynamics facility in Bloomington, MN, and will be completed by March 2016.

(U.S. Navy image)

FMI: www.navy.mil, www.gd-ais.com, www.generaldynamics.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC