Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sun, Dec 13, 2009

Ready To Fly: B787 Dreamliner Sked To Fly, 12.15.09, 1800 GMT

Final High-Speed Taxi Tests Completed Satisfactorily

Ready for flight... that's the feeling from many at Boeing as their 787 Dreamliner completed some of the final steps left before an actual test flight. Boeing completed high-speed taxi tests on the first 787 Dreamliner Saturday and confirmed that this is the last in a series of functional tests planned in preparation for first flight.

“Our pilots told me the airplane performed beautifully,” said Mike Delaney, vice president and chief project engineer for the 787. “We’re going through and analyzing the data to ensure we’re ready for first flight. From evaluations we’ve done so far, everything looks good.”

During the testing, the airplane reached a top speed of approximately 130 knots (150 mph, 240 kph), and the pilots lifted the nose gear from the pavement. Earlier in the week Boeing confirmed that a review and analysis of a Nov. 30 static test to validate the side-of-body modifications on the 787 Dreamliner had been completed, and the airplane structure validated for first flight.

During the test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to their limit load – the highest loads expected to be seen in service. During the test, the wing successfully deflected 18 feet, some 105 percent of the limit load. Anything over 100 percent is considered a successful test.

FMI: www.boeing.com, www.newairplane.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC