KC-46 Tanker Program Successfully Completes Preliminary Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Thu, May 10, 2012

KC-46 Tanker Program Successfully Completes Preliminary Design Review

Critical Design Review Set For 2013

The KC-46 Tanker program has completed a Preliminary Design Review (PDR) with the U.S. Air Force, a key milestone in the development of the next-generation aerial refueling tanker. The review, which began March 21 and ended April 27, demonstrated that the preliminary design of the KC-46A Tanker meets system requirements and establishes the basis for proceeding with detailed design. Boeing remains on plan to deliver 18 combat-ready KC-46A Tankers by 2017.

"I'm happy with Boeing's performance. They're maintaining a very tight focus on meeting commitments and staying on or ahead of schedule. The program remains on a good path," said Air Force Maj. Gen. Chris Bogdan, KC-46 Program executive officer. "This is important news for the nation's warfighters, because it reaffirms our commitment to delivering the KC-46A tanker on schedule."

The program's next major milestone is a Critical Design Review (CDR) that will take place in the summer of 2013. The CDR will determine that the design of the KC-46A is mature and ready to proceed to the manufacturing phase. "The KC-46 team is designing an aircraft that will offer superior, modern multi-role capabilities for the warfighter, including advanced refueling systems and military avionics, and the ability to transport cargo, passengers and patients," said Maureen Dougherty, Boeing KC-46 Tanker vice president and program manager. "Working closely with our Air Force teammates, we've made tremendous progress in the past 14 months and have the foundation in place to enter the detailed design phase."

In addition to the successful PDR, the Boeing KC-46 team has completed several major milestones on or ahead of schedule over the past year that include a System Requirements Review, Integrated Baseline Review, 767-2C PDR, and Firm Configuration Reviews for the 767-2C and the KC-46A Tanker.

Boeing will build 179 next-generation aerial refueling tanker aircraft that will begin to replace the Air Force's fleet of 416 KC-135 tankers.

FMI: www.boeing.com

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

ANN's Daily Aero-Linx (05.30.24)

Aero Linx: Malibu M-Class Owners and Pilots Association (MMOPA) The Piper M-Class Owners & Pilots Association (PMOPA) is a not-for-profit organization dedicated to the interest>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC