HBS Scheduling WAAS/LPV Upgrade On Pro Line 21-Equipped King Airs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Tue, Jun 08, 2010

HBS Scheduling WAAS/LPV Upgrade On Pro Line 21-Equipped King Airs

Taking Appointments For 200/300 Models

Hawker Beechcraft Services (HBS) announced Monday it is taking orders and scheduling Wide Area Augmentation System (WAAS) upgrades on Rockwell Collins Pro Line 21-equipped King Air 200/300 aircraft. This installation closely follows the introduction of the King Air C90GTi upgrade announced in March.
 


Beech King Air 200C

Similar to the C90GTi WAAS installation, the HBS King Air 200/300 WAAS upgrade offers operational flexibility and cost savings associated with direct and curved area navigation (RNAV) routes. WAAS RNAV offers improved access to special use airspace, high traffic and/or terrain challenged airports.  
 
The HBS WAAS installation offers greater mission success through the use of WAAS enabled Localizer Performance with Vertical Guidance (LPV) approaches. There are currently more than 1,900 LPV approaches certified and in use today. WAAS LPV approaches provide decision heights as low as 200 feet with one half mile visibility. The result is improved safety and cost savings associated with the reduction of missed approaches and flights to alternate airports.
 
WAAS upgrades for the Premier IA and Hawker 400XP/Beechjet 400A are nearing completion and expected by the third quarter of this year. 

FMI: www.hawkerbeechcraftservices.com

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC