AD: BAE Systems | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 23, 2005

AD: BAE Systems

AD NUMBER: 2005-23-12
MANUFACTURER: BAE Systems
SUBJECT: Airworthiness Directive 2005-23-12
SUMMARY:
The FAA is superseding an existing airworthiness directive (AD), which applies to all BAE Systems (Operations) Limited Model BAe 146 and Model Avro 146-RJ airplanes. That AD currently requires revising the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness to incorporate life limits for certain items and inspections to detect fatigue cracking in certain structures. This new AD requires revising the ALS of the Instructions for Continued Airworthiness to incorporate new and more restrictive life limits for certain items and new and more restrictive inspections to detect fatigue cracking in certain structures. This new AD results from issuance of a later revision to the airworthiness limitations of the BAe/Avro 146 Aircraft Maintenance Manual, which specifies new inspections and compliance times for inspection and replacement actions. We are issuing this AD to ensure that fatigue cracking of certain structural elements is detected and corrected; such fatigue cracking could adversely affect the structural integrity of these airplanes.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC