AD: Pratt & Whitney | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jan 03, 2003

AD: Pratt & Whitney

AD: Pratt & Whitney
AD NUMBER:  2000-16-02R1
SUBJECT:  Airworthiness Directive 2000-16-02 R1
SUMMARY:  This amendment revises an existing airworthiness directive (AD), that is applicable to Pratt & Whitney PW4164, PW4168, and PW4168A series turbofan engines. That AD currently requires initial and repetitive torque checks for loose or broken front pylon mount bolts made from INCO718 material and MP159 material. That AD also requires initial and repetitive visual inspections of the primary mount thrust load path. This amendment requires extension of the cycles accumulated before performing the initial inspection, reduces the frequency of repetitive inspections for MP159 material bolts, and adds a terminating action to the primary mount thrust load path inspections by introducing a new increased durability forward engine mount bearing housing. This amendment is prompted by component testing to assess the low cycle fatigue (LCF) life of the MP159 material bolts and the development of a new design forward engine mount bearing housing that meets the 8,000 flight cycle design intent for inspection. The actions specified by this AD are intended to prevent front pylon mount bolt and primary mount thrust load path failure, which could result in an engine separating from the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20001602R1

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC