Twin GRAIL Spacecraft Shipped To Launch Site | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Wed, May 25, 2011

Twin GRAIL Spacecraft Shipped To Launch Site

Lunar Orbiters Set For September Launch

NASA's twin GRAIL spacecraft were delivered to Kennedy Space Center in Florida on May 20. The two Lockheed Martin vehicles will undergo four months of final testing and processing in preparation for launch from Cape Canaveral Air Force Station on a United Launch Alliance Delta II Heavy launch vehicle in early September.


NASA Artist's Rendering GRAIL Satellites On Orbit

The lunar orbiters will fly 30 miles above the surface of the moon in precision formation to determine the structure of the lunar interior from crust to core and to advance understanding of the thermal evolution of the moon. 

"It has taken a great deal of dedication and hard work from the entire team to bring us to this moment," said John Henk, GRAIL program manager at Lockheed Martin Space Systems Company. "Building two spacecraft simultaneously brought some challenges, but I'm proud that we are delivering them to the launch site on schedule and under budget."


Satellites Prepped For Transport

"It has taken a great deal of dedication and hard work from the entire team to build two spacecraft simultaneously and achieve this delivery milestone on schedule and under budget," said John Henk, GRAIL program manager at Lockheed Martin Space Systems Company. "We look forward to preparing for launch and achieving total mission success on this important program."

Both of the 440-pound spacecraft were transported on an Air Force C-17 transport plane in an environmentally controlled container. The plane departed from Buckley Air Force Base near Denver and touched down at 1940 EDT at Kennedy Space Center's Shuttle Landing Facility. The spacecraft were then transported to Astrotech Space Operations in Titusville, FL, for final launch processing.

The Gravity Recovery And Interior Laboratory (GRAIL) mission will fly nearly-identical spacecraft in tandem orbits around the moon for several months to measure its gravity field in unprecedented detail. The mission will also answer longstanding questions about Earth's moon, and provide scientists a better understanding of how Earth and other rocky planets in the solar system formed.

FMI: http://solarsystem.nasa.gov/grail

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC