Fincke's Oxygen Leak Pinned Down | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Mon, Jun 28, 2004

Fincke's Oxygen Leak Pinned Down

Next ISS Spacewalk: June 29th

Specialists in Moscow Sunday continued to analyze the cause of an unexpectedly high rate of pressure loss in the primary oxygen bottle on Astronaut Mike Fincke’s Russian space suit, which terminated Thursday’s spacewalk after 14 minutes.

Planners have retargeted the Extravehicular Activity (EVA) for no earlier than Tuesday, June 29, based on Russian ground station communication coverage. That is expected to be confirmed Monday following the next meeting of the International Space Station’s (ISS) Mission Management Team.

Almost immediately after switching their Orlan spacesuits to internal power and opening the Pirs Docking Compartment hatch to start the EVA, Fincke and Expedition 9 Commander Gennady Padalka were told to terminate the spacewalk and begin troubleshooting efforts to determine the cause of the pressure loss in the primary oxygen tank on Fincke’s suit.

Once the ISS was reconfigured for normal operations, the troubleshooting began, which stretched into today with additional evaluations focusing on an injector switch that increases the flow of oxygen into the Orlan spacesuit. The crew cycled the switch on and off several times, while observing the suit injector system’s status light.

Though investigation into the cause of the injector switch problem will continue throughout the weekend, Russian flight controllers assured the crew that its procedures were executed properly and it could expect to use the same suits when the spacewalk is rescheduled.

The objective of the spacewalk is to restore power to Control Moment Gyroscope (CMG) #2 by replacing a Remote Power Controller Module (RPCM). CMG #2 was taken off line April 21 by a failure of a circuit breaker in the RPCM. Currently, because of the failure of CMG #1 about two years ago, the attitude of the Station is being adequately controlled by the two remaining CMGs.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC