Modernization Work Begins In Naples On G.222s For Afghanistan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Nov 04, 2008

Modernization Work Begins In Naples On G.222s For Afghanistan

Predecessors To Today's Spartans Refurbished With New Avionics, Interiors

The refurbishment and modernization of 18 G.222s, purchased by the United States Air Force and destined for the re-established Afghan Air Force, has begun at Alenia Aeronautica’s Capodichino plant in Naples.

On September 30, Alenia North America signed a $287 million contract to provide 18 refurbished and modernized G.222 aircraft. The aircraft were previously in service with the Italian Air Force and reacquired by Alenia Aeronautica in conjunction with the Italian Air Force’s acquisition of a new fleet of C-27J Spartans.

The aircraft are to be modernized at Capodichino with state of the art avionics and general improvements according to the specific requirements of the United States Air Force. Two of these craft will be outfitted for a VIP soundproof module and equipped with seats, desks and a pantry so as to be used for the transport of Afghan leaders.

Four G.222s, sent from Pisa and Pratica di Mare air bases, have already arrived at Capodichino to begin the refurbishment and modernization process. The eighteen G.222s to be provided to the Afghan National Army Air Corps were produced between 1977 and 1985 in several avionic and cockpit configurations. As part of the modernization effort, all 18 will be upgraded to a standard avionic and system configuration, with a new autopilot system, ballistic protection and new maintenance operations. The refurbishment and modernizations are anticipated to last between 12 and 15 months per aircraft.

The first refurbished and modernized G.222 will be delivered to the Combined Security Transition Command in Afghanistan halfway through 2009 and the entire supply will be complete by 2011.

Today's version of the G.222, the C-27J Spartan, was recently selected by the US Army and Air Force for the Joint Cargo Aircraft (JCA) Program.

FMI: www.aleniana.com/

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC