Kopter: SH09 Back 'Home' After Successful Flight Tests In Pozzallo | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Sep 17, 2020

Kopter: SH09 Back 'Home' After Successful Flight Tests In Pozzallo

Next Test Priorities Will Explore Capabilities Of The New Tail Rotor And Recent Aerodynamic Mods

Since the resumption of the test flight activities in June in Pozzallo, Sicily, Kopter's third prototype (P3) has completed 40 flights, allowing testing of multiple aerodynamic modifications and configurations. The current configuration fitted on P3 has seen a significant improvement in smoothness and stability.

Recent upgrades include an engine cowling extension for improved aerodynamics, a variable asymmetric tail plane at the best available incidence, the removal of the end plates and a larger upper vertical fin improving stability.

Richard Grant, Kopter Chief Test Pilot, commented: “P3 returns to Mollis a very different aircraft. The changes that have been implemented this year have made a real improvement to the handling of the aircraft. Now we are able to further expand the envelope and start to realize the aircraft’s true potential”

This most recent block of flight tests has been the most productive in terms of the number of modifications assessed and the general improvements realized. Early analysis and observations confirm the validity of the new design concepts. This achievement is a result of the work of all teams involved, utilizing the analysis and feedback from all the previous flight test blocks of P3. The SH09 is more and more reaching the planned overall performance and capabilities as development moves ahead.

For the next chapter in the SH09 evolution, P3 is back to the home facility in Mollis where upcoming upgrades require a strong support from the Engineering and Operations teams.

On return to Mollis, the test priorities are to explore the capabilities of the new tail rotor and the recent aerodynamic modifications throughout the low speed envelope and the upgrade to the final main rotor head and flight controls.

FMI: https://koptergroup.com/

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC