Full Steam Ahead For TVAC Testing For ExoMars | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 04, 2019

Full Steam Ahead For TVAC Testing For ExoMars

Airbus-Assembled ExoMars Rover Will Be Thermal Vacuum Tested For Two Weeks

Testing of the ExoMars rover at Airbus in Toulouse has moved to the next stage with the start of the thermal vacuum testing (TVAC) which will last about 18 days.

The rover has been in Toulouse since late August undergoing a series of tests to prepare it for its flight to the Red Planet in 2020. The European Space Agency ExoMars project will feature the first rover designed to look for life on Mars.

As part of the TVAC testing the rover will be heated and cooled to simulate the harsh conditions of its journey through space, and the conditions it will have to endure on the surface of Mars. Temperatures will be set to mimic two “hot” and two “cold” Martian days or sols – a sol lasts 24 hours, 39 minutes and 35 seconds.

The team from Airbus in Stevenage is working hand in hand, together with Thales Alenia Space and with their Airbus colleagues in Toulouse to ensure the rover is ready for its next phase on its journey for being integrated in Cannes into the Descent Module of the Spacecraft Composite prior to being sent to Baikonur for the launch in the July/August 2020 window.

ExoMars is a European Space Agency program executed in cooperation with the Russian Space Agency Roscosmos with contribution of NASA. Thales Alenia Space is the ExoMars mission prime and the main other industrial partners are OHB for the carrier and Lavochkin for the descent module. The rover integration was completed at Airbus in the UK with Thales Alenia Space supplying the Analytical Laboratory Drawer, OHB the complex laboratory mechanisms, Leonardo providing the drill and nine different instrument teams from ESA Member States, NASA/JPL and IKI/Roscosmos providing its Pasteur payload set.

(Image provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC