Embraer Boosts Phenom Maintenance Intervals To 800 Flight Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jul 28, 2020

Embraer Boosts Phenom Maintenance Intervals To 800 Flight Hours

This Is A 33% Maintenance Interval Improvement

Embraer has revised the Scheduled Maintenance Requirements (SMR) for the Phenom family of jets. The revision extends the intervals between stops from 600 flight hours and/or 12 months and multiples to 800 flight hours or 12 months and multiples. Most of the tasks with double intervals were also optimized to the longest period.

This is a 33% maintenance interval improvement, which is almost double the industry average. To Phenom series customers, this significant improvement equates to less downtime, lower maintenance costs, a long economic life, and more time in the air.

The improvement was only made possible by the performance of the Phenom fleet over the last decade.

"Conceived as clean-sheet designs to be the best in their respective classes, the Phenom 100 and 300 series aircraft were built for high utilization. Now, eleven years after the first delivery, with a fleet of over 900 jets in operation, our customer support and engineering team can reaffirm, once again, that our products are even better than the initial specification," said Johann C. Bordais, President & CEO, Embraer Services & Support.

The Phenom fleet has accumulated more than 1.7 million flight hours and 1.4 million cycles since the first delivery of the Phenom 100 in December 2008. Embraer's business jet operators are supported by a global services and support organization and its network of more than 70 owned and authorized service centers, complemented by a 24/7 Contact Center at its headquarters in Brazil.

The Scheduled Maintenance Requirements for the Phenom jets were developed to meet the specific needs of business aviation and are based on the Maintenance Steering Group (MSG-3) methodology. The methodology aims to preserve and restore the inherent safety and reliability levels of the aircraft and to build a knowledge base for design and maintenance improvement. The main benefits of this methodology include higher aircraft availability and overall cost reduction to keep the aircraft in ideal operating conditions.

FMI: https://services.embraer.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC