Shuttle Crew Checks Out Equipment For Return To Flight Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 22, 2005

Shuttle Crew Checks Out Equipment For Return To Flight Mission

The astronauts of the Space Shuttle Discovery got a chance to work with some of the equipment they will be taking to space. Flight commander Eileen Collins and her crew were at NASA's Kennedy Space Center, Fla., for the Payload Crew Equipment Interface Test.

The Return to Flight mission of the Space Shuttle (STS-114) is targeted for launch during a window from May 15 to June 3. Returning the Shuttle to flight and completing the International Space Station are the first steps in the Vision for Space Exploration, a stepping-stone strategy toward new exploration goals. STS-114 is the first of two test flights following the Columbia accident. The seven-member Discovery crew will fly to the Station to evaluate procedures for flight safety, including orbiter inspection and repair techniques, and will deliver much-needed supplies.

The astronauts performed tests today to ensure the equipment for the mission's three spacewalks worked properly, and they inspected the cargo containers installed in the Italian-built Multi-Purpose Logistics Module, called Raffaello. They performed fit checks on the Thermal Protection System (TPS) repair sample box, the Control Moment Gyro (CMG), and the External Stowage Platform-2 (ESP2).

The sample box contains pieces of the Shuttle's heat-shielding tile. The samples will enable the crew to test new on-orbit repair techniques recommended by the Columbia Accident Investigation Board.

The new gyroscope will replace an inoperable one on the International Space Station. CMGs provide attitude control for the Station, keeping it properly positioned in space. The ESP2, similar to a large toolbox, will carry replacement parts to the Station. The platform will be deployed, attached to the Station's airlock and used as a permanent spare parts facility.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC