Bell and US Army Advance Development of V-280 Valor | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Apr 04, 2021

Bell and US Army Advance Development of V-280 Valor

The V-280 Team Has Executed A Flight Test Program Flying More Than 200 Hours

Bell is executing the second phase of a Competitive Demonstration and Risk Reduction contract to inform the imminent program of record competition for U.S. Army’s Future Long-Range Assault Aircraft (FLRAA).

Bell Textron and the U.S. Army have agreed to terms on the execution of the second phase of the Competitive Demonstration and Risk Reduction (CD&RR) contract that was awarded in March 2020 for the Future Long-Range Assault Aircraft (FLRAA) program. This new contract is an important milestone and testament to the continued momentum for Army modernization. Bell’s V-280 Valor design advances from an aircraft with transformational speed and survivability towards a low-risk weapons system ready to support joint combined arms and maneuver operations around the world.

“This is the next step to a program of record and Bell is proud to closely collaborate with the Army to transition our flight-proven V-280 Valor into a highly-capable and sustainable FLRAA weapons system,” said Keith Flail, executive vice president, Advanced Vertical Lift Systems at Bell. “Bell and our Team Valor teammates continue to optimize our platform based on research, design, and thorough flight-testing of the aircraft to deliver an outstanding capability for the Army.”

During phase one of the CD&RR, Bell provided detailed iterations on the V-280 design, data to highlight the feasibility of executing the program of record requirements, and executed trade studies using model-based systems engineering.

This work will continue under phase two as the Army finalizes requirements for the program of record planned for 2022.

Bell has already successfully completed a rapid design, build, and test program with the V-280. Since its first flight in 2017, the V-280 team has executed a rigorous flight test program flying more than 200 hours through over 160 individual test flights that delivered critical data to validate Bell’s digital models and performance.

“This aircraft is not an engineering science project. The V-280 tiltrotor provides a critical and combat-proven capability needed to maintain our U.S. military’s ability to deter adversaries by radically improving over the current fleet’s speed, range, versatility, and sustainability. Our program has provided evidence that the V-280 is a transformational long-range assault aircraft solution for the Army and we are proud to move forward as a team to continue to mature the weapons system,” said Ryan Ehinger, vice president and program director, FLRAA at Bell.

FMI: www.bellflight.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC